I have accepted a number of quotes for work to be done over the Christmas holiday period. Synthetic grass (a more realistic pile than on the sports areas) will be installed on the Green Building side of the Gully around the water tanks. Initially it was planned to grow real grass in this area however I don’t think with the high volume of foot traffic and compacted soil in this area that this will be possible.

I have also accepted a quote for over 130m2 of decking to be constructed linking the 3/4 Portables to enable access to all rooms and an outdoor teaching area. The decking is custom built to also allow a third portable to be dropped in to place as a perfect levelled piece should we require it in the future.

Both of these jobs are scheduled to be completed over the holiday period as well as the installation of more outdoor storage spaces.

 